Gamestudio Links
Zorro Links
Newest Posts
Zorro 2.70
by jcl. 09/29/25 09:24
optimize global parameters SOLVED
by dBc. 09/27/25 17:07
ZorroGPT
by TipmyPip. 09/27/25 10:05
assetHistory one candle shift
by jcl. 09/21/25 11:36
Plugins update
by Grant. 09/17/25 16:28
AUM Magazine
Latest Screens
Rocker`s Revenge
Stug 3 Stormartillery
Iljuschin 2
Galactic Strike X
Who's Online Now
3 registered members (TipmyPip, AndrewAMD, dBc), 18,430 guests, and 6 spiders.
Key: Admin, Global Mod, Mod
Newest Members
krishna, DrissB, James168, Ed_Love, xtns
19168 Registered Users
Previous Thread
Next Thread
Print Thread
Rate Thread
Limit time period for testing #478309
09/29/19 19:41
09/29/19 19:41
Joined: Mar 2018
Posts: 8
V
VHX Offline OP
Newbie
VHX  Offline OP
Newbie
V

Joined: Mar 2018
Posts: 8
Hi,
can I limit the time period when I test the Z systems? I.e. I wnat to run the sysem only for 2018 or 2019 to see the results.
Any way to do that?
Thanks

Re: Limit time period for testing [Re: VHX] #478321
10/02/19 10:36
10/02/19 10:36
Joined: Jul 2000
Posts: 28,024
Frankfurt
jcl Offline

Chief Engineer
jcl  Offline

Chief Engineer

Joined: Jul 2000
Posts: 28,024
Frankfurt
Indirectly. The backtest has a fixed time period, but you can extract a time period from the generated CSV file with the trades, and evaluate it in Excel.


Moderated by  Petra 

Gamestudio download | Zorro platform | shop | Data Protection Policy

oP group Germany GmbH | Birkenstr. 25-27 | 63549 Ronneburg / Germany | info (at) opgroup.de

Powered by UBB.threads™ PHP Forum Software 7.7.1